Stasiun Pengisian Kendaraan Listrik Umum SPKLU PT Prastiwahyu Tunas Engineering
ELECTRIC MOBILITY INFRASTRUCTURE · HARDWARE, EPC & JOINT OPERATION

EV Charging & SPKLU Ecosystem Solutions. AC 7kW–DC 240kW+ Procurement, Turnkey EPC & Management Partnerships.

PT. Prastiwahyu Tunas Engineering delivers end-to-end electric vehicle charging solutions: internationally certified hardware procurement, SLO-certified electrical and civil turnkey installations, through to commercial SPKLU revenue-sharing partnerships.

HARDWARE PORTFOLIO & TECHNICAL BLUEPRINT

EV Charger Product Portfolio From AC 7kW to DC Ultra-Fast Charging.

Engineered for durability in tropical climates, high conversion efficiency (≥ 95%), comprehensive Type 2 & CCS2 connector compatibility, and native OCPP 1.6 JSON support for centralized cloud monitoring.

PT. PRASTIWAHYU TUNAS ENGINEERING · AC EV CHARGER 7kW (WALL-MOUNTED)
TYPE 2 CONNECTOR · IP54 / IK10 WEATHERPROOF
Spesifikasi Blueprint AC EV Charger 7kW Wall-Mounted
Daya Output
7.4 kW / 32A (1-Phase)
230 VAC ± 10%, 50 Hz
Form Factor
Wall-Mount Kompak
320 × 950 × 200 mm
Konektivitas & Display
LED Status & RFID
Emergency stop button
Proteksi Kelistrikan
RCD Type B + SPD
Over/Undervoltage, Grounding
AC SLOW / MEDIUM 7 kW – 22 kW

AC Smart Wallbox & Dual Socket

7 kW (1-Phase) and 22 kW (3-Phase) Type 2 options. Ideal for office facilities, residential communities, hotels, condominiums, and long-dwell commercial parkings.

DC FAST CHARGER 30 kW – 60 kW

DC Compact Commercial Hub

Fast DC charging for commercial corporate fleets, electric taxis, logistics delivery hubs, and semi-public charging stations with 45–60 minute durations.

DC FAST CHARGING 120 kW DUAL GUN

DC Fast Charger 120 kW (2 Ports CCS2)

The gold standard for public SPKLU stations. Rapid 20–40 minute charging with dynamic load balancing between dual high-speed charging guns.

DC ULTRA-FAST 180 kW – 240 kW+

DC Ultra-Fast Highway Corridor

Ultra-rapid charging capacity for highway rest areas, intercity transit corridors, and multimodal flagship transit stations with voltage up to 1000V DC.

3 FLEXIBLE COOPERATION MODELS

Commercial Provision Models & EV Charging Management Partnerships.

Prastiwahyu provides complete commercial flexibility: from direct certified hardware purchases to full turnkey EPC station construction, through to long-term revenue-sharing joint operation partnerships for property owners and investors.

MODEL 1

Hardware Supply (Unit Only)

Official SNI/IEC certified EV charging hardware supply. Clients purchase equipment outright and manage civil/electrical installation using in-house contractor resources.

  • Pilihan unit lengkap AC 7kW hingga DC Ultra-Fast 240kW+.
  • Official factory warranty and guaranteed spare parts support.
  • Dokumentasi manual instalasi & panduan teknis operasional.
  • Initial hardware parameter setup and commissioning guidance.
Konsultasi Unit
MODEL 2

Turnkey EPC (Complete Ready-to-Operate Installation)

End-to-end turnkey delivery. PTE manages equipment procurement, civil foundation & canopy works, power cabling, dedicated LVMDP distribution panels, and official SLO operational certification.

  • Studi kelayakan teknis & gambar layout site elektrikal.
  • Pekerjaan konstruksi sipil, fondasi beton, canopy, & marka parkir.
  • Penarikan kabel tanah, instalasi grounding < 2 Ohm, panel proteksi.
  • Testing commissioning, sertifikasi SLO resmi, & serah terima siap beroperasi.
Request EPC Turnkey Solution
MODEL 3 · KEMITRAAN INVESTASI

Joint Operation Partnership (Revenue Sharing)

Strategic joint-operation charging partnership for property owners (landlords), retail mall operators, hotels, building managers, and investors seeking passive income from the EV ecosystem.

  • Mitra / Landlord: Menyediakan alokasi lahan strategis & investasi awal (CAPEX).
  • PTE: Menyediakan unit charger, operasional teknis, sistem OCPP, pemeliharaan berkala, & integrasi ekosistem.
  • Skema Bagi Hasil: Fleksibel & terukur (contoh: kombinasi bagi hasil di tahun awal hingga modal kembali).
  • Integrasi Ekosistem: Connected to digital payment gateways and PLN Mobile network.
Pelajari Skema Kemitraan
INFRASTRUCTURE ENGINEERING & SITE LAYOUT

Standard Industrial Site Layout & Power Distribution Flow.

Engineered site layouts featuring dedicated EV parking bays, underground feeder distribution from main LVMDP panels, and heavy-duty weather canopy integration for user safety and operational longevity.

Layout Rekayasa Infrastruktur Site SPKLU Komersial
Kebutuhan Lahan
± 2–3 Slot Parkir Mobil
Area terdedikasi per unit DC Fast Charging Dual Gun.
Distribusi Daya
LVMDP & Cable Trenching
Jalur kabel bawah tanah berpelindung pipa conduit baja.
Facilities & Amenities
Retail, F&B & Keamanan
Kenyamanan pengguna selama durasi pengisian daya 20–40 menit.
Sistem Pengaman
LOTO & RCD Type B
Type B DC residual current protection and emergency stop isolation switches.
PARTNERSHIP FRAMEWORK & IMPLEMENTATION TIMELINE

Joint Operation Framework & 6-Phase Site Realization.

Joint SPKLU operational partnerships designed with transparent financial payback models, rapid construction milestones, and long-term maintenance accountability.

Infografis Proposal Kerjasama SPKLU Per Site 120kW Dual Gun
INVESTMENT PARAMETERS PER SITE

Package: 1 Unit DC Fast Charging 120 kW (Dual Gun).

Estimated Initial CAPEX
CAPEX Mulai Dari ± Rp 500-an Juta / Site
Includes 1 unit 120 kW DC Fast Charger (Dual CCS2), heavy-duty power cabling, dedicated feeder panel, civil foundations, steel canopy structure, branding signage, and turnkey commissioning.
Estimated Return on Investment (ROI)
Payback Period Maksimal ± 3,5 – 4 Tahun
Projected 2.5 – 3.5 years based on average daily charging sessions and kWh throughput margins. Following the payback period, net operating margins expand significantly.
6-PHASE PROJECT IMPLEMENTATION TIMELINE
1
Studi Kelayakan & Lokasi (Hari 1): Physical site inspection, accessibility evaluation, traffic volume analysis, and commercial revenue viability.
2
Request Site Visit PLN (Maks. 7 Hari Kerja): Grid power capacity application (120 kW) to PLN and confirmation of electrical connection point.
3
Teknis Visit oleh PTE (Maks. 7 Hari Kerja): Technical cable routing survey, layout blueprint recommendations, and Bill of Quantities (BOQ) preparation.
4
Dealing & PKS Landlord (Maks. 10 Hari Kerja): Commercial partnership negotiation, cooperation term alignment, and location agreement signing.
5
Dealing & PKS PLN (Maks. 7 Hari Kerja): Perjanjian kerja sama penyediaan daya SPKLU bersama PLN UP3.
6
Instalasi, Testing & Go-Live (Maks. 7 Hari Kerja): Hardware procurement, civil and electrical construction, OCPP backend integration, and commissioning.
Protokol Komunikasi Backend
OCPP 1.6 JSON compliant (upgradeable to OCPP 2.0.1)
Konektivitas Jaringan
4G LTE Cellular Modem, Gigabit Ethernet, Wi-Fi, RFID Reader
Efisiensi Sistem Konversi
≥ 95% pada daya output pengisian nominal
Proteksi Kelistrikan Terintegrasi
RCD Type B, SPD Surge Protection Type 1+2, Over/Undervoltage, Ground Fault
Ketahanan Enclosure Lingkungan
Outdoor IP54 Weatherproof, IK10 Mechanical Impact Resistant