Reliable Power Distribution Across 15 MRT Stations & Greater Jakarta LRT

Client
MRT Jakarta & LRT Jabodebek
Sector
Transportasi Rel Publik
Scope
15 MRT Stations & Entire LRT Network
Region
DKI Jakarta & Jawa Barat
Absolute Reliability & Uninterrupted Power Distribution.
National strategic transit developments MRT Jakarta Phase 1 and LRT Jabodebek demand 99.999% continuous electrical availability to safeguard hundreds of thousands of daily commuters across all underground and elevated stations.
Each passenger station and traction substation required robust power distribution switchboards engineered for continuous operation under dense urban railway load profiles.

Type-Tested Modular Design & Precision Engineering.
PT. Prastiwahyu Tunas Engineering engineered and manufactured the complete Low Voltage Main Distribution Panel (LVMDP) and Sub-Distribution Panel (SDP) packages based on Schneider Electric Prisma iPM with certified IEC 61439-1 & 2 type-test verification.
Each switchboard was fabricated at our Cikarang manufacturing plant featuring Form 4b internal segregation, ensuring complete physical isolation between circuit breaker compartments, 99.9% Cu-ETP copper busbars, and cable connection termination chambers.
Proven Field Reliability and Continuous Operational Performance.
All 15 underground MRT stations and the Greater Jakarta LRT transit lines were supplied, verified through rigorous in-house Factory Acceptance Testing (FAT), and commissioned on schedule for commercial revenue service.
Sustainable Power Solutions for Modern Mass Transit.
PTE power distribution infrastructure has operated with 100% operational reliability, zero insulation failures, and flawless protection selectivity throughout years of passenger revenue operations.